Surfaces U1/8
1100 Vienna, Favoritenstraße
Client: Magistrat der Stadt Wien – MA 28
Construction time: 1 year 1 month
Construction specification:
As part of the extension of the U1 to the south, after the tram tracks have been removed, the roadway will be redesigned, including a generous design of the sidewalks and cycle paths.