1060 Vienna, 1070 Vienna, Mariahilfer Straße
Client: Magistrat der Stadt Wien – MA28
Construction time: 1 year 2 months
Construction specification:
Conversion of Mariahilfer Straße into a meeting zone (concrete stone paving) and a pedestrian zone (natural stone paving).
Narrowing of the driving range
Sidewalk widening
The former road surface has been raised to the level of the sidewalks