Vienna, Hafen Freudenau, New mixed water sewer construction
1020 Vienna, Hafen Freudenau

Client: Wien Kanal – MA30

Construction time: 10 months

Construction specification:
Construction of a mixed water canal between Seitenhafenstrasse and Freudenau power station, with a total length of around 2,050 running meters, a DN 1400 pipe compression of around 50 running meters, a pumping station in in-situ concrete – a ballast trap in front of it with a retention volume of 3 m³ including electrical and mechanical equipment.