B9 Fischamend, Lower Austria, Road reconstruction

B9, Fischamend airport street
B9, Fischamend airport street, asphalt paving
B9, Fischamend airport street
B9, Fischamend airport street, asphalt paving
previous arrow
next arrow
 

B9 Fischamend – airport
Road reconstruction

Client: Land Niederösterreich – Straßenbauabteilung 2, Tulln

Construction time: 3 months

Construction specification:
The order includes the construction of a new lane including master builder services (empty piping and foundations) for the construction of a new traffic light system and lighting. For the turning lane, a 120 m long cycle path had to be laid in an existing slope. The new slope stabilization was carried out using natural stone finishing.
Following this work, the top 2 asphalt layers of the B9 were renewed over a length of approx. 3 km within 12 working days.