Hainburg, Lower Austria, Waste collection center
Construction of a new recycling center including steelwork and drainage canal
Construction of a new recycling center including steelwork and drainage canal
Conversion of the old waste material collection center into a recycling center
Production of aeration tanks, secondary clarifiers, including outdoor facilities and supply and discharge lines
New construction and reconstruction of the station while the railway operations are maintained
Redesign of the main square including road construction and paving work
Road and bridge construction work with connection to the existing road network
Conversion of Mariahilfer Straße into a meeting zone and a pedestrian zone
Redesign of the road including the design of the sidewalks and cycle paths