General renovation of Federal Ministry of Finance Vienna
1010 Vienna, Himmelpfortgasse 4-8
Client: Burghauptmannschaft Österreich
Construction time: 6 years
Construction specification:
The entire complex, the former winter palace of Prince Eugene and the adjoining Palais Questenberg and other buildings were completely renovated and modernized according to the requirements of its use. Underpinning all the foundations, excavating the basement areas and covering the entire surface with new reinforced concrete slabs after the collectors for the building services have been manufactured.
Full air conditioning of the building complex
Generous staircase with 2 elevators
All non-load-bearing interior walls and floors including fillings removed, the historic interior plaster renovated using lime plastering technology or backfilled using lime milk.